Skip to content
Sunshine Coast Concrete Driveways
  1. Home
  2. New concrete driveways

New concrete driveways on the Sunshine Coast

A new driveway from bare ground or building handover, excavated, based, poured and finished by one crew, with the panel layout drawn before the pour.

$100 to $150 per m2, supply and install Get a fixed quote (07) 5230 8717

Rates move with site conditions and variations; the number that holds is the written quote after a site measure.


A new driveway is poured once and looked at every day after that. The difference between one that stays flat and one that cracks by its third summer is not the concrete on top, it is the ground preparation, the steel and the joint layout underneath, which is exactly where this site’s published rates put the money.

What the job includes

Every new driveway through this site is one scope, one crew, one written price: excavation and levels, compacted base to suit the ground, steel mesh on chairs, a 25 MPa pour at 100mm minimum, the finish of your choice, control joints cut on planned lines within a day, and crossfall set so stormwater leaves the slab instead of pooling against the garage. Nothing on that list is an optional extra, because none of it is optional if the driveway is to last.

Finishes and what they cost

Plain grey with a broom finish is the working standard and starts at $100 per m2. Full depth oxide colour runs $110 to $130 and keeps its colour because the pigment goes through the slab, not on it. An exposed aggregate finish runs $135 to $150 where a decorative surface is wanted or the estate requires one. On covenant land in Aura and Harmony, plain grey is generally not permitted, so budget from the coloured row up and check the design guidelines for your release.

Sand, clay and the coast’s weather

Beach side suburbs sit on sand that drains quickly but must be properly compacted before it carries a slab. The hinterland runs to clay and loam that swell and shrink between seasons, which asks more of the base and the joint layout. Both get handled at the site measure, not discovered at the pour, and summer pours are timed for the morning before the heat and the afternoon storms.

The crossover is part of the job

The strip between your boundary and the road is council territory, built to the council’s standard drawing. A standard crossover needs no permit with Sunshine Coast Council or Noosa Shire; a non standard one needs written approval before work starts. Which one yours is is stated in writing on your quote, and the crossovers page covers both councils in detail.

Getting a price

The pricing page publishes every rate with worked examples by driveway size, and the calculator gives you a range in seconds. Rates move with site conditions and variations; the number that holds is the written quote after a site measure.

Exposed aggregate concrete driveway freshly poured at a new build home
Exposed aggregate finish, fresh off the pour
Fresh concrete pour with the next bay formed and steel mesh in place
One bay down, the next formed and steeled

Where we pour

Baringa, Beerwah, Bells Creek, Buderim, Caboolture, Caloundra, Coolum, Golden Beach, Kawana, Landsborough, Maleny, Maroochydore, Mooloolaba, Morayfield, Mountain Creek, Nambour, Nirimba, Noosa, Palmview, Palmwoods, Peregian Beach, Sippy Downs and the rest of the coast: all suburbs.

How a job runs

Six steps between enquiry and parking on it

  1. 01

    Site measure

    Levels, falls, access and the ground itself, measured at your place. If the block slopes to the garage, drainage is planned now, not discovered at the pour.

  2. 02

    Fixed written quote

    One price for the scope measured, with the base, steel and thickness stated in writing. Any crossover approval or estate covenant your job needs is identified here.

  3. 03

    Out with the old

    On replacements, the existing driveway is broken out and carted off, and the base is recompacted. New pours start with the ground, not on top of what failed.

  4. 04

    Base, forms and steel

    Compacted base to suit sand or clay, forms to the setout, mesh on chairs so it works inside the slab. This day decides how long the driveway lasts.

  5. 05

    Pour and finish

    Poured at 25 MPa and finished in one continuous run, timed for the weather. Broom, colour or the finish your covenant requires.

  6. 06

    Cut and cure

    Control joints cut on planned lines within a day, then the slab is kept curing. Cars stay off for seven days; the concrete keeps hardening for a month.

Questions

New concrete driveways, answered

What does a new concrete driveway cost?

From $100 per m2 supply and install for plain grey broom finish, $110 to $130 for coloured, and $135 to $150 for an exposed aggregate finish. A typical single driveway of 45 m2 lands between $4,500 and $6,750. Rates move with site conditions and variations; the number that holds is the written quote after a site measure.

What is included in the rate?

Everything between bare ground and a finished driveway. Excavation, compacted base, steel mesh on chairs, 25 MPa concrete at 100mm minimum, the finish you chose, control joints cut on time and crossfall set so water leaves the slab. The build standard page lists it line by line.

When should the driveway be poured on a new build?

After handover and after heavy vehicles are done with the block. In Harmony the covenant requires the driveway to be completed within 30 days of handover, so it pays to have the quote and any covenant approval settled before you get the keys.

How long before we can park on it?

Walk on it the next day, park the car after a week. Full strength takes about a month to arrive, so give trucks and heavy trailers that long before they touch the new slab.

Next step

A fixed written price for your driveway, after a site measure.

Call (07) 5230 8717 Fixed quote